Planning: catch the gap, find the fix, get it approved

Budgets and rolling forecasts next to your data in iDataWorkers. When a plan breaks, the optimizer recommends a fix, checks it independently and sends it for approval.

Planning: catch the gap, find the fix, get it approved

One late payment can break the whole plan

Most plans live in spreadsheets, away from the data and away from the approver.

  • The gap shows up late

    A buyer installment slips a month and December drops below the cash floor. Spreadsheets rarely flag it in time.

  • The fix is a guess

    Delay a phase? Expedite a purchase? Teams debate it with no proof the answer is the best one.

  • Approval happens outside the plan

    Versions multiply, and nobody can say which numbers were signed.

One late payment can break the whole plan

Plan → optimize → approve

One workspace, three steps, every step on the record.

  • 1 · Plan

    Enter budgets and rolling forecasts, calculate and submit. An independent approver locks the version. Compare any forecast with the approved budget. No optimizer needed.

  • 2 · Optimize

    Mathematical optimization recommends the decision: which purchases, transfers or expedites cover site demand at the lowest cost, or which phase to launch and when within your cash-floor and escrow rules.

  • 3 · Approve

    Every recommendation is replayed and checked independently before anyone can adopt it. Adopting creates a new draft that still needs its own approval. Nothing is posted to your source systems.

Plan → optimize → approve

Real estate: a late installment, cleared without borrowing

Live demo · Vertex Developments, Al Waha

  • The problem

    A buyer installment moves from December to January. The plan shows December SAR 75,000 below the cash floor.

  • The fix

    The optimizer moves Phase B to January. The gap closes and borrowing stays at zero.

  • The rules it respects

    Cash floors, escrow restrictions, launch windows and phase order.

Real estate: a late installment, cleared without borrowing

Construction: a failed inspection, a safer start date

Live demo · Al Wafa Construction, Jeddah Gate

  • Cash first

    A failed column-alignment inspection delays a progress receipt. The optimizer moves mobilization to January to protect cash.

  • Scaffold across three sites

    Allocate scaffold with and without expediting, and see exactly what speed costs.

Construction: a failed inspection, a safer start date

Planning Designer: your form, your rules

Model how your business plans, without a developer.

  • Build it

    Admins define dimensions, members, formulas and totals.

  • Publish it

    Each publish is a fixed version. Later edits never change a version a team already uses.

Planning Designer: your form, your rules

English and Arabic, same plan

Switch language in the same workspace. Arabic runs right to left.

English and Arabic, same plan

Roles and governance

  • Viewer

    Reads plans and results in scope. Changes nothing.

  • Planner

    Enters, calculates and submits plans.

  • Approver

    Approves submitted plans. Approval locks the version.

  • Designer

    Builds planning forms and publishes fixed versions.

  • Independent checks

    Every recommendation is replayed and verified before it can be adopted.

  • Source systems untouched

    Plans and recommendations stay in Planning. Nothing is posted back.

Bring us the plan that keeps breaking

We walk through the real-estate or construction demo live, then map it to your case.